• All
  • ACES Conference 2005
  • ACES ICEC Conference 2003
  • Cost Analysis
  • Cost Control
  • Education
  • Estimating
  • Mastering Complex Projects Conference 2014
  • PC Conference 2017
  • Planning & Scheduling
  • Presentations Victoria 2009-2017
  • Project Control
  • Project Management
  • Risk Management
  • Software
  • Total Cost Management
  • Uncategorized
Date Presentation Name Presenter Comments
April 17, 2018 What is TCMF Varan Karunakaran
April 17, 2018 Infrastructure Decision- Making Models William McDougall
September 22, 2017 Fri 1530 4.8 Guy Barlow
September 22, 2017 Fri-1530-4.8-Guy-Barlow
September 21, 2017 Thur 0845 4.8 Dale Connor
September 21, 2017 Thur-0845-4.8-Dale-Connor
September 20, 2017 1100-4.8-Ian-Watt
September 20, 2017 1245-4.9-Saleh-Elshobokshi-v2
September 20, 2017 1245-4.10-Natasa-Gadzuric
September 20, 2017 Chivonne-Algeo-Abstract
September 20, 2017 Controls-Conference-Presentation-d-vf
September 20, 2017 David-Hodes-Projects-suprises-or-science
September 20, 2017 Fri 1030 4.8 Adele Eagleton
September 20, 2017 Fri 1100 4.8 Alexia Nalewaik v2
September 20, 2017 Fri 1245 4.9 David Hodes
September 20, 2017 Fri 1245 4.10 Alex James
September 20, 2017 Fri 1315 4.8 Paul Schmidt
September 20, 2017 Fri 1315 4.10 Robert Bolton
September 20, 2017 Fri 1345 4.8 Brendan Hodge
September 20, 2017 Fri 1345 4.8 David Garrett
September 20, 2017 Fri 1345 4.9 A.Sanchez
September 20, 2017 Fri 1415 4.8 Kylie Dwyer
September 20, 2017 Fri-0945-4.8-Marion-Terrill
September 20, 2017 Fri-1030-4.8-Adele-Eagleton
September 20, 2017 Fri-1100-4.8-Alexia-Nalewaik-v2
September 20, 2017 Fri-1245-4.9-David-Hodes
September 20, 2017 Fri-1315-4.8-Paul-Schmidt
September 20, 2017 Fri-1345-4.8-David-Garrett
September 20, 2017 Fri-1345-4.9-A.Sanchez
September 20, 2017 Fri-1415-4.8-Kylie-Dwyer
September 20, 2017 Lance Stephenson6ElementsOfPC
September 20, 2017 Michael-Clarke-LogiKal-workshop
September 20, 2017 PCC2017-RES-Contingency-Guideline-Workshop-PDM2
September 20, 2017 PCCSYD2017-SRA-Workshop-Abstract-Rev-2
September 20, 2017 PPC-2017-Resrodel-for-distribution
September 20, 2017 Rod-Hemassi-A-Dirty-Little-Secret-1
September 20, 2017 The-Six-Elements-of-Project-Controls
September 20, 2017 Thur 0930 4.8 Chris Lock
September 20, 2017 Thur 1100 4.8 Ian Watt
September 20, 2017 Thur 1245 4.8 Pieter Rautenbach
September 20, 2017 Thur 1245 4.9 Saleh Elshobokshi v2
September 20, 2017 Thur 1245 4.10 Natasa Gadzuric
September 20, 2017 Thur 1315 4.9 Warren Black
September 20, 2017 Thur 1345 4.8 Jonathan Shahady
September 20, 2017 Thur 1345 4.10 Ross Hall and Troy Burton
September 20, 2017 Thur 1415 4.9 Colin Cropley
September 20, 2017 Thur 1415 4.10 Lou Vidotto
September 20, 2017 Thur 1530 4.8 Chivonne Algeo Final
September 20, 2017 Thur 1600 4.8 Rod Hemassi
September 20, 2017 Thur-0930-4.8-Chris-Lock
September 20, 2017 Thur-1315-4.9-Warren-Black
September 20, 2017 Thur-1345-4.8-Jonathan-Shahady
September 20, 2017 Thur-1345-4.10-Ross-Hall-and-Troy-Burton
September 20, 2017 Thur-1415-4.9-Colin-Cropley
September 20, 2017 Thur-1415-4.10-Lou-Vidotto
August 29, 2017 Wed 1315 4.9 Jim Zack
May 31, 2017 Finding work in an ever changing world Matthew Lustini, Technical Resources
April 18, 2017 The Cost of Waste in Manufacturing Wen Shan
April 18, 2017 Reducing Waste in Manufacturing- Wen Shan Apr 18th 2017
April 18, 2017 The Cost of Waste in Manufacturing Robert Dick
March 16, 2017 Cost Blowout – A Tsunami on the Way – The Real Value of an Accurate Estimate Peter Steele / Jayson Tiu
February 27, 2017 2017-02-21 Big Data Revolution in Construction (Tim Crisp) for Publicati
February 27, 2017 ACES Presentation 17 May Brad McLean
February 21, 2017 The Big Data Revolution in Construction Tim Crisp
February 8, 2017 2017 ACES DL flyer. draft 2
January 1, 2017 GrahameDuff Presentation to Cost Engineers GrahameDuff
January 1, 2017 PaulHarris031021 Selecting Project Management Software Paul Harris
January 1, 2017 MCP_WHITEPAPER brochure
January 1, 2017 MCPC14-ABS-1031
January 1, 2017 MCPC14-ABS-1032
January 1, 2017 MCPC14-ABS-1036
January 1, 2017 MCPC14-ABS-1038
January 1, 2017 MCPC14-ABS-1047
January 1, 2017 MCPC14-ABS-1048
January 1, 2017 MCPC14-ABS-1051
January 1, 2017 MCPC14-ABS-1061
January 1, 2017 MCPwhitePaperMethodologyR3
January 1, 2017 20170921_Project Control Conference__Paul Telling Illustration
January 1, 2017 Fri 0915 4.8 Yvonne Butler
January 1, 2017 Fri 0945 4.8 Marion Terrill
January 1, 2017 Fri-0915-4.8-Yvonne-Butler
January 1, 2017 Project-Controls-Conf-Sept-2017-L-Kirk-v3.0
January 1, 2017 Thur 1315 4.8 AdrianSmith
July 19, 2016 Cost Control for Survival – Manufacturing in Australia Today Simon Wong
July 19, 2016 Cost Control for Survival – Manufacturing in Australia Today Linsey Siede
July 19, 2016 Manuf Cost Control Rev_1
June 19, 2016 ASEA Presentation – SCE -16-07-19 ManufCostControl
May 18, 2016 Human Factors in Project Performance
May 17, 2016 Human Factors in Project Performance Brad McLean
May 17, 2016 Human Factors in Project Performance Peter Mercoulia
May 17, 2016 Human Factors in Project Performance Gaye Francis
May 17, 2016 Human Factors in Project Performance Tim Ellis
May 17, 2016 Peter Mercoulia Presentation ammend1
May 15, 2016 ACES AACE Australian Section Membership Histograms – May 2016 Alistair Bowden
May 4, 2016 JDPA5076 ACES RES Seminar 21 June Speakers 4 dot points 030516
February 23, 2016 Introduction to Total Cost Management Workshop Martin van Vliet
February 21, 2016 1_-_Introduction_to_Total_Cost Management_Workshop
February 18, 2016 Introduction to Total Cost Management – Workshop Martin Van Vliet
February 16, 2016 The Role of the Cost Engineer within Project Management Martin Van Vliet
February 14, 2016 3_-_ Cost Engineering_-_The_Role_of_the_Cost_Engineer_within_Project_Management
February 12, 2016 The Role of the Cost Engineer within Project Management Martin van Vliet
February 10, 2016 2_-_Total_Cost_Management_Solutions
January 25, 2016 ACES DL flyer V3_2016
January 21, 2016 ACES 2016 Program FullDetail RevH
November 24, 2015 Cost Control in the Auto indutry PPT (1)
November 17, 2015 Learn Cost Control from the Auto Industry: The ways and means from an industry specialist Wen Shan & Side Paul Fall
October 19, 2015 PB_-_Ellis_T How to increase chance of project success
October 5, 2015 2015MarApr_AACEI_Soft Skills_ce15-03
September 16, 2015 How Cost Engineers work with Purchasing Michael Woods – GM Holden
September 15, 2015 Defence Project Controls, what’s the current thinking on how to use earned value? Mark Ruffell-Hazell
August 14, 2015 The art of controlling Engineering Design Objectives Adrian Werny
July 21, 2015 The art of controlling Engineering Design costs Adrian Werny
June 19, 2015 AJD Cost Engineering PresentationJun
June 19, 2015 Design for Excellence_Pat Strickland_160615Jun
June 16, 2015 The Pursuit of Excellence or Pursuit of Value Anthony Dorinko
June 16, 2015 The Pursuit of Excellence and Value Steve Litterick
June 1, 2015 The Pursuit of Excellence and Value Steve Litterick, Alliance Operations Manager
June 1, 2015 Procuring Class E Trams Gaye Francis
May 19, 2015 Risk control beyond the Australian standard: A joint panel with the Risk Engineering society Dr Stephen Grey
May 19, 2015 Risk control beyond the Australian standard: A joint panel with the Risk Engineering society Gaye Francis
May 19, 2015 Risk Control Beyond ISO 31000 John Paterson
May 19, 2015 Risk Control Beyond the Australian Standard ACES RES 190515 John PatersonMay
May 19, 2015 Risk management Beyond the basics Dr Stephen GreyMay
March 5, 2015 4_-_Total_Cost_Management_Framework_2.0
February 17, 2015 PPP’s, Winners and Losers: Costs from the owner and contractor perspectives James Mitchell, Aquenta Consulting
February 17, 2015 PPPs Winners and LosersFeb
January 11, 2015 Implementation of a PMO at Los Angeles Metro Julie Owen AACEi President
November 25, 2014 MCPC14-ABS-1037
November 25, 2014 MCPC14-ABS-1063
November 25, 2014 Control_of_cost_and_schedule_for_success
November 24, 2014 MCP_WHITEPAPER final
November 24, 2014 MCPC full paper publication v3 Contents
November 24, 2014 MCPC full paper publication v3
November 24, 2014 MCPC14-ABS-1039
November 24, 2014 MCPC14-ABS-1040
November 24, 2014 MCPC14-ABS-1041
November 24, 2014 MCPC14-ABS-1054
November 24, 2014 MCPC14-ABS-1055
November 24, 2014 MCPC14-ABS-1057
November 24, 2014 MCPC14-ABS-1060
November 24, 2014 MCPC14-ABS-1064
November 24, 2014 MCPC14-ABS-1065
November 24, 2014 MCPC14-ABS-1066
November 24, 2014 MCPC14-ABS-1070
November 24, 2014 MCPC14-ABS-1074
November 24, 2014 MCPC14-ABS-1076
November 24, 2014 MCPC14-ABS-1077
November 24, 2014 MCPC14-ABS-1078
November 24, 2014 MCPC14-ABS-1079
November 24, 2014 MCPC14-ABS-1084.A
November 24, 2014 MCPC14-ABS-1084.B
November 24, 2014 MCPC14-ABS-1085
November 24, 2014 MCPC14-ABS-1087
November 24, 2014 MCPC14-ABS-1090
November 24, 2014 MCPC14-ABS-1091
November 24, 2014 MCPC14-ABS-1092
November 24, 2014 MCPC14-ABS-1093
November 24, 2014 MCPC14-ABS-1099
November 24, 2014 MCPC14-ABS-1100
November 24, 2014 MCPC14-ABS-1101
November 24, 2014 MCPC14-ABS-1103
November 24, 2014 MCPC14-ABS-1105
November 24, 2014 MCPC14-ABS-1106
November 24, 2014 MCPC14-ABS-1107
November 24, 2014 MCPC14-ABS-1109
November 24, 2014 MCPC14-ABS-1111
November 24, 2014 MCPC14-ABS-1112
November 24, 2014 MCPC14-ABS-1114
November 24, 2014 MCPC14-ABS-1115
November 24, 2014 MCPC14-ABS-1117
November 24, 2014 MCPC14-ABS-1118
November 24, 2014 MCPC14-ABS-1119
November 24, 2014 MCPC14-ABS-1120
November 24, 2014 MCPC14-ABS-1122
November 24, 2014 MCPC14-ABS-1123
November 24, 2014 MCPgreen_paper-FINALweb
October 21, 2014 Manufacturing – Control of Cost and Schedule for Success Stuart Inglis
October 13, 2014 131014 Managing Productivity on Linear Projects (final)
September 16, 2014 Procurement and Logistics – How Cost Engineers work with purchasing Michael Woods
August 25, 2014 MCPC14-ABS-1045
August 20, 2014 How_to_lead_the_recovery.pdf
August 19, 2014 Project Rescue – How To Lead The Recovery David Chandler
June 17, 2014 Stakeholder Management – Why You Should Care? Dr Lynda Bourne
June 3, 2014 AACE International Certification Laurie Bowman
May 20, 2014 Leadership in Risk Treatment John Paterson
May 14, 2014 Leadership in Risk Treatment Rev B 260514May2014
April 15, 2014 Project Controls – The Evolution of Cost and Progress Nicholas Fahey
April 1, 2014 Backcharges Reece Allen
March 19, 2014 ACES Presentation on Communications March 2014
March 18, 2014 Communications – The Glue That Binds The Project Team Gary Campbell
March 4, 2014 Senior Management Review of Project CPM Schedule Daniel Such / Donald McDonald
March 2, 2014 ACES Presentation -Apr2014N Fahey – Productivity copy
February 19, 2014 DGTalk slidesFeb2014
February 18, 2014 Planning – Leading for Success Digby Grant
February 4, 2014 Project Controls and Certification Lou Vidotto
February 4, 2014 Australian Cost Engineering Society Lou Vidotto
January 30, 2014 aces_2014_cpd_flyer
January 1, 2014 Project controls in Alliances
January 1, 2014 Project Cost Control in Alliances Presentation – Tyson Fehring
January 1, 2014 ProjectValueEscalation
November 1, 2013 ACES Presentation – 15 Oct – Productivity
October 17, 2013 130916 PLANNING and SCHEDULING PACKAGES where are they at
October 17, 2013 ACES Oct 2013 Productivity and Learning Curve Panel
October 17, 2013 ACES Oct 2013 Productivity and Learning Curve PanelR1
October 15, 2013 PRODUCTIVITY & LEARNING CURVE John Paterson, Rick Boreham, Nick Fahey
October 15, 2013 Productivity and Learning Curve
September 13, 2013 PLANNING and SCHEDULING PACKAGES where are they at? Paul Harris
September 1, 2013 ACES_Aug2013Managing the Unknowns
September 1, 2013 ACES_Aug2013Managing the UnknownsR1
August 20, 2013 MANAGING THE UNKNOWNS (RISKS / ASSUMPTIONS/ CONTINGENCY) John Paterson
July 17, 2013 ACES – Beyond the Software
July 16, 2013 Beyond the software – four steps for implementing a system Adrian Werny
June 26, 2013 Fundamentals of Capital Cost Estimating Lou Vidotto
June 19, 2013 ACES CMS Presentation June 2013
June 19, 2013 ACES CMS Presentation June 2013Comms
May 21, 2013 Keep It On Track Presentation – 21 May 2013 Anthony Heazlewood
April 23, 2013 EOT Claims: Successful Navigation through a Legal and Technical Minefield Dr. Anamaria I Popescu
April 23, 2013 ACES Planning and Scheduling 130421
April 11, 2013 ACES_estimating_getting_it_right_march_2013
April 11, 2013 ESTIMATINGGettingItRight2013_03_18
March 26, 2013 Determining a cost estimates suitability for feasibility purposes Alistair Bowden
February 20, 2013 ACES_Feb2013StartItRight
January 1, 2013 AlanOldhamACES_AO_2 Alan Oldham
December 5, 2012 Operational and Managerial Flexibility: Value Creation and Decision Making Luis A. Martinez, ROMPEV Pty Ltd.
November 29, 2012 2013 Seminar Program ACES
November 29, 2012 Measuring Complexity Oct 2012 [Compatibility Mode]
November 18, 2012 ACES_MEASURING_COMPLEXITY_2012_10_31
October 31, 2012 ACES2013TechProgFlyer
October 4, 2012 ACES PresentationAug2012IntegratedDesignImpacts
September 18, 2012 Project Controls for Alliances Talk 180912 rev 1
August 21, 2012 BIM & Change – Australian Cost Planning Association
August 21, 2012 Integrated Design Impacts on Project Controls
July 27, 2012 ForecastingFinalProjCostIncNotes
July 22, 2012 Forecasting the final Project Cost: it’s not simple! Nolan Bear What is required to reliably forecast a complex project? This presentation by Nolan Bear will explain why we forecast and what systems and human factors are required to get it right.
July 21, 2012 Progress Measurement Lou Vidotto
June 19, 2012 Realistic Estimation: a professional estimator’s view Stuart Chalmers
June 18, 2012 REALISTIC ESTIMATION 2012_06_19
June 18, 2012 REALISTIC ESTIMATION_Jun2012
May 15, 2012 Communicating Project Performance Malcolm Sawle Protect your credibility and get it right! A discussion on some of the various ways of communicating project performance and how to develop the required metrics using key performance indicators.
May 10, 2012 ACES PresentationMS_May2012
March 23, 2012 ACES2012seminar program23Mar2012
March 23, 2012 ACESCost EngineeringProjectSuccessMarch2012
March 22, 2012 Cost Engineering: Making a success of Project Management Gary Campbell, career professional in Project Controls & Management Cost Engineering is all about the skills required for managing change and forecasting where a project will end up compared to a plan and budget and then managing the scope and risks so as to give the best chance of success. Alongside this is the requirement to keep stakeholders informed and avoid surprises. For a large and complex project these simple concepts require considerable sophistication and experience to achieve a successful result amongst the many competing interests.
February 28, 2012 Forensic Schedule Analysis Techniques Dr. Anamaria Popescu
November 16, 2011 Contract Administration – A nicety or a necessity? David Court, Managing Director of Contract Solutions International
August 11, 2011 seven Reasons Why Information Technology Projects Fail
August 4, 2011 Whats happening and coming with ACES and AACE International Keith Webb
July 19, 2011 Money for Mega Projects: how bankers weigh risk Wai Mun Lum, Head of Mining and Resources Infrastructure, Project and Structured Finance, ANZ Bank
July 19, 2011 Technical Meeting ACES 190411ANZfinance
June 22, 2011 110621BestPracticeManagementOfRisksInProjects
June 21, 2011 BEST PRACTICE MANAGEMENT OF RISK IN PROJECTS Colin Cropley
May 17, 2011 The Future of Project Controls Nolan Bear
May 17, 2011 The Future of Project Controls
April 19, 2011 Planning for Success or Planning for Problems Digby Grant
April 19, 2011 DGA Planning for Success
April 18, 2011 RMT_Issue9_IRA_ArticleCropleyCost_schedRisk
March 29, 2011 How Financiers assess project risks and its applicability to Bankable Feasibility Studies Wai Mun Lum
March 15, 2011 Turbocharge Your Project: Noel Bear, Chairman ACES Victoria
February 15, 2011 Work Breakdown Structures Malcolm Sawle
February 15, 2011 Developing_a_WBS
February 15, 2011 Developing_a_WBS2
November 22, 2010 P128b_Stakeholder_Relationship_ManagementJun2014
November 16, 2010 ACES (Vic) Professional Program for 2011, controlling projects matters. Nolan Bear
September 30, 2010 ACES_Education
September 29, 2010 Education Programmes in Project Control Keith Webb
September 28, 2010 Quantifying the Effect of Delay & Disruption Phillip Blunden
September 22, 2010 Project Controls, the essential elements Gary Campbell: a long term career professional in project controls and Project Management
September 22, 2010 PROJECT CONTROLStheEssentialElements
May 18, 2010 A presentation on Prince 2 project management methodology Paul Harris. Director Eastwood Harris Pty Ltd
March 16, 2010 What Price Your Project? Noel Bear, Chairman ACES Victoria
February 16, 2010 The Project Control Iron Triangle Laurie Pole MIEAust, AACE
February 16, 2010 Iron Triangle_26 Feb 2010_handouts
November 24, 2009 Poject Control Procedures and System Interfaces at Ausenco Dathan Beasley
November 17, 2009 091104 P2 2009 & MSP ITTS presentation
November 17, 2009 Prince2Presentation
September 15, 2009 Ten Common Planning Issues Terry Truong - Dartnell, Grant & Associates
September 15, 2009 Ten Common Planning Issues Terry Truong - Dartnell, Grant & Associates
August 20, 2009 Coal Bed Methane/Coal Seam Methane – Gathering and Production Peter Fitzgerald/Chris Lawson - Zektin Group
July 22, 2009 Construction Lean Improvement Program (CLIP) Bruce Searles
July 22, 2009 EVP.pdf0
July 21, 2009 The Earned Value Professional Rohin Walker
June 20, 2009 Certified Estimating Professional Certification Gary Campbell
May 27, 2009 A guide through the knowledge areas required for planning & scheduling professional certification Paul E Harris
May 3, 2009 ACES VIC 2009 Program
July 30, 2008 National_BIM_guidelines_July08_presentation
May 15, 2008 Nolans Presentation Jim Slattery
February 19, 2008 Resource Management Andrew Dick
September 18, 2007 Risk Analysis for Project Managers Dr Stephen Grey
July 17, 2007 Claims Avoidance and Resolution Peter Downie
February 27, 2007 CostControl_KeithWebb07
February 22, 2007 Cost Control – It’s Not Just About Numbers! Keith Webb
July 19, 2006 Project Cost Contingency David Baccarini
July 18, 2006 Cost Controlling the $1.4 billion Alice Springs to Darwin Railway Rohin Walker
June 12, 2006 CIB W70 2006 Trondheim International Symposium – Changing User Demands on Buildings Needs for lifecycle planning and management
March 29, 2006 Distance Learning for Cost Engineering Carole Bruce, Turner & Townsend Rawlinsons
February 15, 2006 The Art Of Negotiation Alana Dowley, Jackson McDonald lawyers
November 14, 2005 Benchmarking Process to Verify Sanction Estimates for Offshore Facilities Allan Edgar, Turner & Townsend Energy
November 14, 2005 An Examination of Residual Risk in Projects Geoffrey W Richardson FIE Aust.
November 14, 2005 Why Final Costs Differ from Estimates Peter Breuchle
November 14, 2005 The Legal Basis for Valuing Claims Alana Dowley, Jackson McDonald lawyers
November 14, 2005 Benchmark your cost data for trending comparison, forecasting and capital efficiency improvements Guru Gulvadi, Water Corporation
November 14, 2005 Enterprise wide coding: systems solutions to organisational problems Alistair Bowden
November 14, 2005 Best Practice and Standardisation Nick Brown, Kildrummy
November 14, 2005 Improving the odds for project success Laurence Pole CPEng MIEAust
November 14, 2005 Enterprise_wide_coding Alistair Bowden
October 18, 2005 Advanced Cost Engineering Part 2 – The Execution Jane Connelly
September 20, 2005 Advanced Cost Engineering Part 1 – The Aquisition Peter DiGuisto
July 20, 2005 Breakfast Function – New Payment Risk In The Mining And Oil & Gas Industries Alana Dowley, Jackson MacDonald lawyers
July 19, 2005 eProcurement Geoff Bencraft, United KFPW
June 15, 2005 Residual Risk on Projects Geoff Richardson
May 18, 2005 Occupational Standards for Project Control Keith Webb - Woodside Energy Limited
May 18, 2005 Mind Mapping Malcolm Sawle
April 21, 2005 How_do_we_improve_the_odds David James
April 20, 2005 Drilling for Dummies – Technical Presentation Iain Hutchinson
April 20, 2005 Detailed Pipe Estimation Peter DiGuisto
March 12, 2005 Swinburne Cost Engineering Course Laurie Pole
January 1, 2005 Benchmark_cost_data_for_trending Guru Gulvadi
January 1, 2005 Best_practice_and_standardisation
January 1, 2005 Benchmarking_process
January 1, 2005 Why_estimates_are_different
January 1, 2005 Residual_risk
January 1, 2005 Legal_basis_for_valuing_claims-slides
January 1, 2005 Legal_basis_for_valuing_claims
November 15, 2004 Productive Excel Techniques, Add ins, camera, text manipulation and lots more Noel Bear
October 15, 2004 How to estimate a Software Development Project Steven Toal, Database Consultants Australia
August 18, 2004 Construction Contracts Act WA – How It affects you Paul Wellington
August 18, 2004 Conceptual Estimating Phil Angel, Currie and Brown
August 18, 2004 Eclipse – Overview of CSSP’s Innovative Estimating Software Patrick Kennedy, CSSP
August 18, 2004 Why Bother With Project Controls? Richard Linton, Transfield Worley
August 18, 2004 Incorrect Estimates – Are You a Target? Isla McRobbie, Jackson McDonald lawyers
August 15, 2004 A scheme to make the River Stroudwater Navigable, circa 1755 Geoff Richardson
July 21, 2004 Uncertainties of Delay Costs? Mark Taylor, Jackson McDonald lawyers
July 15, 2004 Schedule Risk, an overlooked cause of Project over runs Colin Cropley, Pertmaster
May 19, 2004 Managing Project Cost Contingency Keith Webb, Woodside Energy Limited
May 15, 2004 Engineering Design Measurement Paul Leitinger
April 21, 2004 Project Cost Contingency – Guess & Hope David Baccarini, Senior Lecturer Curtin University of Technology
April 15, 2004 New Corporate Governance (CLERP9 & USA Sarbanes Ocley) Project Management Requirements Paul Harris, Eastwood Harris Pty Ltd
March 15, 2004 Pros and Cons of Modularisation Tom Connelly, Pearce-Connelly Pty Ltd
February 18, 2004 Managing Project Risk using “Pertmaster Project Risk ” software Colin Cropely. Contract Project Mangement
February 15, 2004 Effective Techniques for Schedue Delay Analysis in Dispute Resolution Michael Kruimel
November 19, 2003 Finalising and Documenting the Estimate Grahame Duff, Chief Estimator, Sinclair Knight Merz
November 18, 2003 Estimate Based vs Schedule Based Cost Control Systems Malcolm Sawle / Noel Bear
October 23, 2003 Introduction to Estimating Jim Slattery
October 23, 2003 Estimate Preparation and Planning Anthony Heazlewood, Senior Estimator, Kellogg, Brown & Root
October 23, 2003 Doing the Estimate Tom Connelly, Chief Estimator, Pearce-Connelly Pty Ltd
October 23, 2003 Finalising and Documenting the Estimate Grahame Duff, Chief Estimator, Sinclair Knight Merz
October 23, 2003 Using the Estimate Jason Whyte, John Holland
October 23, 2003 Challenges in Introducing a Software Estimating System into your Company Alan Oldham, GTS Software, Telfer Mine Project
October 23, 2003 Risk Assessment as part of Estimates Valli Arunachalam, Senior Estimator, Bechtel Australia
October 23, 2003 Selection of Appropriate Software Paul Harris, Eastwood Harris Pty Ltd
October 23, 2003 Introduction to Estimating Jim Slattery
October 23, 2003 Estimate Preparation and Planning Anthony Heazelwood, Kellogg Brown & Root
October 23, 2003 Doing The Estimate Tom Connelly, Pearce-Connelly Pty Ltd
October 23, 2003 Finalising and Documenting the Estimate Grahame Duff, Sinclair Knight Merz
October 23, 2003 Using the Estimate Jason Whyte, John Holland
October 23, 2003 Risk Assessment as part of Estimates Valli Arunachalam, Bechtel Australia
October 23, 2003 Selection of Appropriate Software Paul Harris, Eastwood Harris Pty Ltd
October 23, 2003 Challenges in Introducing a Software Estimating System into your Company Alan Oldham, GTS Software
October 23, 2003 The Role of Estimates and Risk Management in Managing Projects Ray Bartlett, Major Projects Victoria
September 15, 2003 AACEI Special Interest Groups and the possibilities in ACES Noel Bear and Peter Downie
August 20, 2003 Are we losing control of Project Controls? Debbie Dow, Woodside Energy Limited
August 20, 2003 Analysing Opportunity and Risk Graham Hawkins, Woodside Energy Limited
August 20, 2003 Conceptual Estimating Alistair McMichael and Peter Clack
August 20, 2003 Controlling Projects with Primavera Jim Fairchild, PCS Pty Ltd
August 20, 2003 Managing the Claims Process Alana Dowley, Jackson MacDonald Solicitors
August 20, 2003 Capital Cost Estimating – Why it isn’t enough Bernie Cooper, Chief Executive Officer, Silcar
July 18, 2003 Murrin Murrin Nickel Cobalt Process Plant – How it was developed and built Dr David Dolan and Noel Bear
June 17, 2003 How to Implement a Successful Estimating System Dennis Suckling
March 15, 2003 Current E & C Practice Keith Madden
February 15, 2003 Spreadsheets for Cost Engineers Noel Bear
January 1, 2003 BearManagingA_MegaProject Bear
January 1, 2003 GrahamWalkerACESQuestPresnGW Graham Walker
January 1, 2003 JimSlatteryEstimates Jim Slattery
January 1, 2003 Tom ConnellyPowerpoint slide Talk Tom Connelly
January 1, 2003 Jason WhyteAPPLYING THE ESTIMATE Jason Whyte
January 1, 2003 AnthonyHeazlewoodACES Presentaion Oct 2003 Anthony Heazlewood
January 1, 2003 ValliAruna_Risk_03 Valli Aruna
January 1, 2003 RayBartlett031008 ACES talk Ray Bartlett
April 15, 2002 Managing a MegaProject, Contingency and coping with change Noel Bear
April 15, 2002 Crude Stabilisation Facility for ESSO/BHP at Longford, Victoria 1969 Arthur Edwards
April 15, 2002 Techniques for Managing Complex Projects with Planning & Scheduling Software Paul Harris, Eastwood Harris Pty Ltd
April 15, 2002 The Maddock Committee Report, 1998 Jim Slattery
April 15, 2002 The Cost Engineer as Expert Winess – Are there any rules? James G Zack Jr., Fluor Corporation
April 15, 2002 Calculation and Recovery of Home/Head Office Overhead James G Zack Jr., Fluor Corporation
March 26, 2002 Managing a Megaproject Noel Bear
March 5, 2001 2012 ConstrCostEstimating_Bechtel
December 30, 2024
December 30, 2024